PartyWall AI MVP
Schedule of Condition in minutes, not hours.
Isolated demo UI for rapid MVP validation. Built around RICS 2026 compliance controls, AI-assisted photo categorization, statutory deadline tracking, and surveyor sign-off gating.
Photos
0
Labels Confirmed
0
Verified Rows
0
Lifecycle Coverage
0/6
Generated Docs
0
1. Project Setup
Capture party details and statutory service date before ingestion.
Phase 1 — Notice Generation
Classify works, draft correct statutory notice section, and calculate lawful start date.
Works Type
excavation
Notice Section
Section 6
Earliest Start Date
Set service date
Classification rationale: Excavation/foundation keywords detected.
Phase 2 — Response Handling
Generate acknowledgement, dissent route correspondence, and optional Section 4 counter-notice.
Phase 3A — Smart Image Ingestion & Categorization
Bulk upload JPG/HEIC, then run AI grouping by location and defect type for Schedule preparation.
Drag and drop site photos here (JPG/HEIC), or use file picker.
To use real party wall photos in walkthrough mode, add files to /public/demo/partywall-samples/ using the sample case filenames.
Phase 3B — Surveyor Label Review
Confirm or adjust AI-assigned location/defect labels before legal drafting.
Phase 3C — Automated SoC Drafting
Objective surveyor-tone descriptions with mandatory row-by-row verification.
Phase 4 — Party Wall Award
Generate a full Award draft with works-type conditional clauses and manual-flag prompts.
Conditional Protective Clauses
- - Pre-commencement trial pit records and foundation depth check.
- - Vibration and movement monitoring trigger thresholds.
- - Temporary support and sequencing controls for adjoining structure.
Phase 5 — During Works Correspondence
Produce Section 8 access notice, inspection notes, and non-compliance correspondence.
Suggested Section 8 access date: Set date of service.
Phase 6 — Damage Claims & Supplementary Award
Create comparative damage report and supplementary Award where attribution is confirmed.
Lifecycle Coverage
Demonstrate all six statutory phases from notice to damage resolution.
Generated Document Center
Review, present, and download generated matter outputs.
AI Pipeline Activity
Visible input -> process -> output trail for live demos.
System ready. Upload photos or run realistic demo walkthrough.
Compliance Gate (RICS 2026)
Report export remains disabled until each row is confirmed and verified.
Mandatory disclosure appended to every export:
This report was prepared with the assistance of AI and has been personally reviewed and validated by the undersigned surveyor in accordance with RICS Global AI Standards (2026).
Export unlocks only when all items are confirmed and verified by the surveyor.
Statutory Deadline Tracker
Consent/dissent date is auto-calculated as Date of Service +14 days.
MVP Success Metrics
Track value against PRD targets.
Estimated report time
Awaiting upload
Baseline: 180 minutes.
Time saved
0 minutes
Descriptions accepted unchanged
0%
MVP target: 85% accepted without manual edits.
Technical Profile
Isolated demo architecture
- Model: gemini-1.5-pro (2M token context target)
- Storage target: Supabase Storage (AES-256)
- Export target: docxtemplater / docx-templates (.docx)
- Current UI export: Word-compatible draft file for demo purposes
Chain-of-thought prompt
You are an RICS Chartered Surveyor. Describe these property defects for a legal Schedule of Condition. Use precise measurements where visible.